Previous determinations

Determinations are made by MBIE on matters of doubt or dispute to do with building work. Rulings are legally binding, but only in relation to each case.

Previous determinations may provide some useful guidance for those faced with similar problems, but note that individual circumstances may vary.

You can also search for Determinations on Building CodeHub

Find a determination

Applying filters will narrow down your search results

Find a determination

Search results

381 Determinations match your query
Show detailed results

2016/035: Regarding the refusal to issue a code compliance certificate for a 19-year-old house with brick veneer and weatherboard claddings

This determination is concerned with the compliance of a 19-year-old brick veneer house.  This determination considers the authority’s reasons for refusing the code compliance certificate, and whether the house complies with the requirements of the Building Code.

2016/034: Refusal to grant an s72 waiver for two building consents for proposed buildings on land subject to a natural hazard

This determination considers the authority’s refusal to grant a waiver under section 72 of the Act for two proposed buildings which are situated on land subject to a debris flow hazard.  The determination considers the risk to occupants from debris flow events, and the extent to which the proposed work will mitigate this risk.

About this document

2016/028: Regarding the authority's exercise of its powers in issuing a code compliance certificate for a retaining wall

This determination was sought by the owner of an adjacent property who was of the view that the retaining wall and site works did not comply with the Building Code.

About this document

2016/025: Regarding the durability of New Zealand grown European Oak timber for use in a new dwelling

This determination discusses the compliance with Clause B2.3.1 of European oak grown in New Zealand and used as structural framing members.

About this document

2016/024: Regarding the refusal to issue a code compliance certificate for a 21-year-old house with corrugated steel wall cladding

This determination considers the authority’s decision to refuse to issue a code compliance certificate based onits concerns regarding the weathertightness and durability of the exterior envelope. The determination reviewed the reasons given for the refusal and the authority's actions in regards to its inspection, and considered whether the building work complies with the Building Code.

About this document

2016/023: Authority's exercise of its powers in respect of a building consent application and compliance of proposed bracing system for a building

This determination considers a proposed bracing system designed by the applicant and whether the authority had sufficient information in order to establish on reasonable grounds that the building work would comply with the requirements of the Building Code.

About this document

2016/015: Regarding the refusal to issue a certificate of acceptance for remedial work to the membrane roof and parapets of a house

This determination considers the authority’s decision to refuse to issue a certificate of acceptance for remedial work to a membrane roof and parapets. The determination reviews the reasons given for the refusal and discusses the lack of inspections, the information that was before the authority at the time of its decision, and whether the building work was exempt from the requirement to obtain a building consent.

About this document

2016/004: Regarding the weathertightness of some 19-year-old stucco plaster walls to a house

This determination considers the compliance of particular external walls of the house with respect to weathertightness and durability.  The walls are not under eaves that would provide shelter from the weather, and the joinery is not installed in accordance with the manufacturer’s instructions.

About this document

2016/003: Dispute about the issue of building consents and code compliance certificates and the building code compliance of building work for commerci

This determination considers the authority’s decision to issue building consents and code compliance certificates for commercial buildings with pre-cast concrete panels,  and whether the building work complied with Clause B1 of the Building Code. The determination also discusses the difference between an alternative solution and industry practice.

About this document

2016/001: Refusal to issue code compliance certificates for a 15-year-old extension to a house with weatherboard and brick veneer cladding

This determination considers the authority’s decision to refuse to issue a code compliance certificate: the grounds for the refusal were the authority’s concerns regarding the weather-tightness and durability of the exterior envelope, and the structural performance of the foundation wall.  The determination reviewed the reasons given for the refusal and considered whether the items identified in the refusal comply with the Building Code.

About this document

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: