2022/003: Compliance of proposed alterations to a dwelling by way of Acceptable Solutions B1/AS1 and E2/AS3
Document
About this determination
Summary
This determination considers whether two items of proposed building work comply with the relevant Acceptable Solutions. Item 1 concerns reinforcing bars to reinforce a concrete floor slab and whether the proposal complies with Acceptable Solution B1/AS1 for Building Code Clause B1 Structure. Item 2 concerns the use of a damp-proof membrane as waterproofing for a 1060mm high retaining wall and whether the proposal complies with Acceptable Solution E2/AS3 for Building Code Clause E2 External Moisture.