2017/072: Compliance of the ventilation system and the installation of kitchen appliances to a café kitchen
Document
About this determination
Summary
This determination is about matters associated with the fitout of a café kitchen located on the ground floor of a three-storey building. The determination considers the installation and compliance of solid fuel cooking appliances installed in the café kitchen as part of the consented work, and the compliance of the ventilation system to the kitchen.