2020/030: Regarding the purported refusal to grant a building consent because of a dispute about the importance level of the building
Document
About this determination
Summary
This determination considers the authority's purported refusal to grant a building consent for proposed building work because the authority did not agree with the importance level proposed by the structural engineer. The determination discusses whether the subject building should be classified as Importance Level 2 or Importance Level 3 as set out in Australian/New Zealand Standard 1170.0. This standard is referenced by Verification Method B1/VM1, which is a means of compliance with Building Code Clause B1 Structure.