2019/061: Regarding the compliance of a surface water drainage connection

Back to determinations register

About this determination

Summary

This determination considers whether a surface water drain complies with Building Code Clause E1 Surface water: the drain collects water from a roof and is connected to a kerb sump and not directly to a surface water drain.  The authority considers the connection to the sump was contrary to the means of compliance stated in the building consent, being the Acceptable Solution for Clause E1, and that approval should be sought for the work as a minor variation to the consent.

View all determinations on this topic

Back to determinations register

This information is published by the Ministry of Business, Innovation and Employment’s Chief Executive. It is a general guide only and, if used, does not relieve any person of the obligation to consider any matter to which the information relates according to the circumstances of the particular case. Expert advice may be required in specific circumstances. Where this information relates to assisting people: