2019/048: Refusal to issue a certificate of acceptance for plumbing and drainage work associated with a shipping container used as a mortuary
This determination considers the authority’s refusal to issue a certificate of acceptance for plumbing and drainage work that was carried out without building consent. The plumbing and drainage work was installed to convert the shipping container for use as a mortuary and connects to an existing foul water drainage system that services a dwelling on the property, which in turn connects to a septic tank and evapotranspiration bed.